Ballast Water Treatment System Analysis Requirements

Is there a requirement as per IMO for vessels to perform regular analysis of the BWTS (except for the initial commissioning test) similar to the EPA VGP requirement?

1 Like

Good day,
For the time being there is no IMO requirement for BWTS analysis during Class annual surveys.